What is a Pre-Engineered Building?

A Pre-Engineered Building (PEB) is a factory-fabricated steel structural system comprising primary rigid frames (tapered columns and rafters), secondary members (purlins, girts, eave struts), roof and wall cladding, and all accessories — engineered as a complete integrated system and assembled on-site using bolted connections.

6-Phase PEB Service Scope

  1. Design & Engineering — 3D structural modelling to IS 800, NBC & seismic zone standards; permit-ready drawings and foundation design.
  2. Fabrication — CNC-precision-machined primary frames, purlins, girts, bracing, mezzanines and crane beams in a controlled factory.
  3. Surface Treatment — Shot blasting to Sa 2.5, epoxy primer, polyurethane colour finish; hot-dip galvanising available.
  4. Supply & Logistics — Pre-tagged, sequenced component dispatch with full factory-to-site freight management.
  5. Erection & Installation — Certified crew handles primary frame bolting, plumb checks, cladding, roofing, skylights, doors, windows and insulation.
  6. After-Sales Support — 25-year structural warranty, maintenance manuals, expansion consulting, emergency repair support.

PEB Frame Topologies

  • Clear Span — Single-bay, no interior columns, up to 90 m wide
  • Multi-Span — Multiple bays with interior columns for widths over 40 m
  • Lean-To — Mono-slope structure attached to an existing wall
  • Multi-Gable — Multiple symmetric peaks for very wide industrial footprints
  • Single Slope — Mono-pitch flat-slope design
  • Crane Bay — Reinforced frames with overhead crane runway beams

Frequently Asked Questions — PEB

What is a Pre-Engineered Building (PEB)?

A Pre-Engineered Building (PEB) is a steel structure designed and fabricated entirely in a factory, then shipped to the site for rapid bolted assembly. All primary frames (tapered I-section columns and rafters), secondary members (purlins, girts, eave struts), cladding, and accessories are engineered as an integrated system — resulting in 40–60% faster construction and 20–30% cost savings compared to conventional RCC or steel construction.

How much does a Pre-Engineered Building cost in India?

PEB costs in India typically range from ₹1,500 to ₹3,500 per sq ft depending on span width, eave height, loading conditions, cladding specification, and site location. A basic industrial shed of 2,000 sq m may cost ₹80–120 lakhs turnkey, while a multi-span warehouse or crane bay structure may cost more. Maruti Hydraulics offers free preliminary cost estimates — contact us with your requirements.

What is the maximum clear span achievable in a PEB?

Maruti Hydraulics designs single-bay clear span PEB frames up to 90 metres wide with no interior columns. This provides completely unobstructed interior space for material handling, storage racking, production lines, or overhead cranes. For wider buildings, multi-span or multi-gable frames can extend to 200 m or more.

Can an overhead crane be integrated into a PEB?

Yes, Maruti Hydraulics specialises in crane-integrated PEB structures. EOT (Electric Overhead Travelling) cranes from 2T to 50T capacity can be built directly into the PEB primary frame using haunched column brackets and dedicated crane runway beams, designed to IS 800 and crane load standards.

How long does it take to complete a PEB project?

From design sign-off to structural handover, a typical PEB project takes 12–20 weeks: 2–3 weeks for design and drawing approval, 8–12 weeks for fabrication and surface treatment, and 2–6 weeks for erection depending on building size. Factory fabrication and site preparation happen simultaneously, compressing the overall schedule significantly.